中译英,一段文字,谢谢~~练塘工程介绍500kV练塘变电站220kV出线工程,新建线路全长约81.9km,途经松江、青浦、金山三区.本期工程500kV练塘变电站的220kV出线为12回,采用架空线出线,分别为干练变4

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/07 03:06:04
中译英,一段文字,谢谢~~练塘工程介绍500kV练塘变电站220kV出线工程,新建线路全长约81.9km,途经松江、青浦、金山三区.本期工程500kV练塘变电站的220kV出线为12回,采用架空线出线,分别为干练变4

中译英,一段文字,谢谢~~练塘工程介绍500kV练塘变电站220kV出线工程,新建线路全长约81.9km,途经松江、青浦、金山三区.本期工程500kV练塘变电站的220kV出线为12回,采用架空线出线,分别为干练变4
中译英,一段文字,谢谢~~
练塘工程介绍
500kV练塘变电站220kV出线工程,新建线路全长约81.9km,途经松江、青浦、金山三区.本期工程500kV练塘变电站的220kV出线为12回,采用架空线出线,分别为干练变4回,青浦站2回,辰塔站4回,万安2回;采用同塔双回路、四回路架空线形式架设,导线采用2×JL/LB1A-630/45,地线采用ACSR/AS-80/47.沿线气象条件为:设计风速:30 m/s,复冰厚度:5mm,最高温度: +40 ℃,最低温度:-10℃,年平均温度:15℃.沿线所经地区为 III级污秽区.
本工程线路需跨越泖河、拦路港、太浦河、规划在建A15、A30等重要河道和公路.其中跨越泖河段,河道宽度约为420m,线路跨越最低弧垂吴淞高程在27m以上.本工程初设阶段考虑使用耐直直耐方式跨越,跨越档档距约为550m,塔型为ZT4-66,铁塔呼高为66m,全高为82.7m,铁塔一览图如下.
请不要用机器直接翻译

中译英,一段文字,谢谢~~练塘工程介绍500kV练塘变电站220kV出线工程,新建线路全长约81.9km,途经松江、青浦、金山三区.本期工程500kV练塘变电站的220kV出线为12回,采用架空线出线,分别为干练变4
Liantang project introduction
As to the 220kv line outlet project of 500kv Liantang transformer substation project,the overall length of the new line is 81.9km,via three districts of Songjiang,Qingpu,Jinshan.There are 12 turns using trolly wire in the line outlet of this project,4 turns in Ganlian,2 turns in Qingpu,4 turns in Chenta,2 turns in Wanan; with two loops in the same tower,four loops of trolly wire,the voltaic wire is 2×JL/LB1A-630/45,and the earth wire is ACSR/AS-80/47.The weather condition is:designed wind speed:30 m/s,ice load:5mm,maximum temperature:+40 ℃,minimum temperature:-10℃,yearly average temperature:15℃.Degree of pollution is III in the areas passing by.
The project need to cross Mao River,Lanlu Port,Taipu River,and some other planned important rivers and roads,such as A15,A30 and so on.As to the line across Mao River,the width of the river is around 420m,the lowest height which is in Wusong is higher than 27m.The project is considered to use the method of tension-tangent-tension-tangent for crossing in the early stage,the length is around 550m,the tower type is ZT4-66,the height from the lowest transverse plane of the tower to the ground is 66m,and the full height is 82.7m,the picture of the tower is as below.

Liantang engineering are introduced
500kV liantang substation project, new lines 220kV outlet stretches approximately 81.9 km, songjiang, qingpu, jinshan areas. This project 500kV liantang substat...

全部展开

Liantang engineering are introduced
500kV liantang substation project, new lines 220kV outlet stretches approximately 81.9 km, songjiang, qingpu, jinshan areas. This project 500kV liantang substation 220kV outlet for 12 back by bus, respectively, change, return capable qingpu station 2 April 4, Calvin tower stood back and Ann 2 back, Using double loop, and presents four forms of aerial wire, erection by 2 x JL/LB1A - 45, the ground USES 630 / ACSR/AS - 80/47. Meteorological conditions along for: design wind speed: 30 m/s, ice thickness, the highest temperature: 5mm: 40 ° c + +, minimum temperature: - 10 degrees Celsius, the annual average temperature: 15 degrees Celsius. Along the unclean for level III.
Our project must Mao across the river, line TaiPuHe, planning, road construction as an important channel A15 A30, and highways. Mao across the river, the river of approximately 420m line width, height in HuChui minimum spanning 27m. Wusong The engineering design phase consider using resistance, resistance to way across straight up from about 550m shift gears, tower for ZT4-66, call for 66m high tower, 82.7 m high tower, for in figure below

收起

Liantang engineering are introduced
500kV liantang substation project, new lines 220kV outlet stretches approximately 81.9 km, songjiang, qingpu, jinshan areas. This project 500kV liantang substat...

全部展开

Liantang engineering are introduced
500kV liantang substation project, new lines 220kV outlet stretches approximately 81.9 km, songjiang, qingpu, jinshan areas. This project 500kV liantang substation 220kV outlet for 12 back by bus, respectively, change, return capable qingpu station 2 April 4, Calvin tower stood back and Ann 2 back, Using double loop, and presents four forms of aerial wire, erection by 2 x JL/LB1A - 45, the ground USES 630 / ACSR/AS - 80/47. Meteorological conditions along for: design wind speed: 30 m/s, ice thickness, the highest temperature: 5mm: 40 ° c + +, minimum temperature: - 10 degrees Celsius, the annual average temperature: 15 degrees Celsius. Along the unclean for level III.
Our project must Mao across the river, line TaiPuHe, planning, road construction as an important channel A15 A30, and highways. Mao across the river, the river of approximately 420m line width, height in HuChui minimum spanning 27m. Wusong The engineering design phase consider using resistance, resistance to way across straight up from about 550m shift gears, tower for ZT4-66, call for 66m high tower, 82.7 m high tower, for in figure below.
希望有所帮助!

收起

500kV liantang substation project, new lines 220kV outlet stretches approximately 81.9 km, songjiang, qingpu, jinshan areas. This project 500kV liantang substation 220kV outlet for 12 back by bus, res...

全部展开

500kV liantang substation project, new lines 220kV outlet stretches approximately 81.9 km, songjiang, qingpu, jinshan areas. This project 500kV liantang substation 220kV outlet for 12 back by bus, respectively, change, return capable qingpu station 2 April 4, Calvin tower stood back and Ann 2 back, Using double loop, and presents four forms of aerial wire, erection by 2 x JL/LB1A - 45, the ground USES 630 / ACSR/AS - 80/47. Meteorological conditions along for: design wind speed: 30 m/s, ice thickness, the highest temperature: 5mm: 40 ° c + +, minimum temperature: - 10 degrees Celsius, the annual average temperature: 15 degrees Celsius. Along the unclean for level III.
Our project must Mao across the river, line TaiPuHe, planning, road construction as an important channel A15 A30, and highways. Mao across the river, the river of approximately 420m line width, height in HuChui minimum spanning 27m. Wusong The engineering design phase consider using resistance, resistance to way across straight up from about 550m shift gears, tower for ZT4-66, call for 66m high tower, 82.7 m high tower, for in figure below.

收起

中译英,一段文字,谢谢~~练塘工程介绍500kV练塘变电站220kV出线工程,新建线路全长约81.9km,途经松江、青浦、金山三区.本期工程500kV练塘变电站的220kV出线为12回,采用架空线出线,分别为干练变4 一段文字介绍一个传统节日 请你为喻浩写一段介绍性文字 怎样写一段介绍自已的文字? 一段介绍鲁迅的文字,(50~70字即可) 用一段文字介绍我们中国的“万里长城” 第一段文字介绍了蝉哪些放面对特点 请你用一段文字介绍一个难忘的小伙伴 请用一段文字介绍一个传统节日或民俗活动!请用一段文字介绍一个传统节日或民俗活动! 用纸鸢作一段忧伤的文字,谢谢谢谢 生活中有哪些类似“屏”的小物品?并且要写一段文字简单介绍.类似屏风的,快!谢谢了!《说屏》里的 英语翻译介绍MANGO的英语作文,开头需要一段概括性的文字介绍这个公司! 能不能帮我翻译一段文字啊,谢谢 还有什么大自然的文字写一段话100字之内谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢谢 请用一段文字介绍你了解到鲁迅先生!我明天要交!请用一段文字介绍你了解到鲁迅先生! 写一段关于刘诗诗的英文介绍! 很急 谢谢! 从你家的工艺品、玩具或包装盒里选出你感兴趣的一件来,用一段说明文字介绍给大家!各位,帮帮忙啊!谢谢啦! 200字! 劳驾! 写一段说明文字,介绍‘比喻’这种修辞方法,要有比喻的定义,