英语翻译工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/01 15:45:29
英语翻译工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟

英语翻译工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟
英语翻译
工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟建工程的分部分项工程项目、措施项目以及其他项目的名称和相应数量的明细表单;投标人则根据招标文件中的工程量清单和有管要求、施工现场实际情况及拟定的施工方案或施工设计,依据企业定额和市场价格信息,结合市场竞争情况,充分考虑风险,自主报价,并通过市场竞争形成价格的计价方式.
说错了,是中文翻译成英文,
网络翻译工具的就别来了

英语翻译工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟
Bq refers to prepare the tender documents by has ability of the tenderer, or affected by the entrusted with the corresponding qualifications of intermediary agencies, in accordance with the construction project code of valuation with GB50500-2008, according to the bidding notes, construction drawings and construction projects, preparation of division of sectional engineering projects, measures program and other project's name and the corresponding amount of detail form, Bidder is according to the bidding documents to the list of quantities and tube requirements, the construction site actual situation and worked out the construction scheme or construction design, according to enterprise ration and the market price information, combined with the market competition and full consideration of risk, independent quotation, and through the market competition formation price valuation method.

工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟建工程的分部分项工程项目、措施项目以及其他项目的名称和相应数量的明细表单;投标人则根据招标文件中的工程量清单和有管要求、施工现场实际情况及拟定的施工方案或施工设计,依据企业定额和市场价格信息,结合市场竞争情况,充分考虑风...

全部展开

工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟建工程的分部分项工程项目、措施项目以及其他项目的名称和相应数量的明细表单;投标人则根据招标文件中的工程量清单和有管要求、施工现场实际情况及拟定的施工方案或施工设计,依据企业定额和市场价格信息,结合市场竞争情况,充分考虑风险,自主报价,并通过市场竞争形成价格的计价方式。Bq refers to prepare the tender documents by has ability of the tenderer, or affected by the entrusted with the corresponding qualifications of intermediary agencies, in accordance with the construction project code of valuation with GB50500-2008, according to the bidding notes, construction drawings and construction projects, preparation of division of sectional engineering projects, measures program and other project's name and the corresponding amount of detail form, Bidder is according to the bidding documents to the list of quantities and tube requirements, the construction site actual situation and worked out the construction scheme or construction design, according to enterprise ration and the market price information, combined with the market competition and full consideration of risk, independent quotation, and through the market competition formation price valuation method.

收起

英语翻译工程量清单计价是指由具有编制招标文件能力的招标人,或受其委托具有相应资质的中介机构,按照《建设工程工程量清单计价规范》GB50500-2008,依据投标须知、施工设计图纸等,编制拟 关于措施项目工程量清单编制与计价,下列说法中正确的是( ).关于措施项目工程量清单编制与计价,下列说法中正确的是( ).A、不能计算工程量的措施项目也可以采用分部分项工程量清单 建筑工程工程量清单计价规范中桥面铺装层的计量单位是平方米吗 分部分项工程量清单与计价表的工程量,单价,合计价怎么算,怎么录入需要非常详细的表达出来,主要是一点也不懂 相比较编制招标控制价和投标价,竣工结算中的其他项目清单与计价汇总表还应计列( )相比较编制招标控制价和投标价,竣工结算中的其他项目清单与计价汇总表还应计列( )A、暂列金额 施工图预算和工程量清单计价的区别 求2009《四川省建设工程量清单计价定额》 招标文件提供的工程量清单和报价表是什么? 英语翻译清单工程量计算表 、施工工程量计算表、分部分项工程量清单综合单价分析表、分部分项工程量清单计价表、措施项目费分析表、措施项目清单计价表、单位工程费汇总表我不知道 工程量清单编制步骤工程投标,按工程量清单方式报价,其编制要遵循哪些步骤,请问谁知道啊, 清单计价 台阶怎么算工程量 是室外架空台阶 定额是按整体楼梯算 那请问 清单 怎么算 求告知 定额计价与工程量清单计价的特点各有哪些? 定额计价与工程量清单计价的特点各有哪些? 工程量清单计价和定额计价的区别?简要点不要太复杂~ 分部分项工程量清单综合单价组价的依据是什么单位工程定额计价与工程量清单计价在计价程度上有神秘异同? 计价工程量计算表与清单工程量计算表的区别 分部分项工程量清单是指什么 建设工程工程量清单计价规范项目编码后三位数有误是否废标发布的清单编码是010101003003我标的清单编码是010101003002这样是否废标处理